MECHANICAL ENGINEER & CONSULTANT

Christopher Noah Andersen

I am an independent mechanical engineer and energy consultant based in Berlin, Germany.

MORE ABOUT ME

Credentials

SPECIALIZATION

My Services

EXPERIENCE

  • 2005 - 2023

    Lead Mechanical Consultant

    BP — London, United Kingdom

  • 2020 - Present

    Independent Engineering Consultant

    Bureau Veritas — Berlin, Germany

EDUCATION

  • 1998 - 2002

    Bachelor's Degree in Mechanical Engineering

    University of Aberdeen — Aberdeen, UK

  • 2003 - 2005

    Executive Program in Energy Management

    Massachusetts Institute of Technology — Boston, USA

PROECTS COMPLETED

  • Duration: 14 months

    Elgin-Franklin Gas Condensate Platform: Structural Integrity Assessment (North Sea, United Kingdom)

    Conducted full structural integrity assessment of aging topside modules on the Elgin-Franklin platform following fatigue crack detection in primary load-bearing joints. Developed a finite element model to simulate operational and environmental loading conditions, identified critical failure points, and engineered a reinforcement solution using high-strength clamp assemblies — eliminating the need for full module replacement and extending the platform's operational life by an estimated 12 years.

  • Duration: 9 months

    Clair Ridge Development: Subsea Pipeline Thermal Expansion Study (West of Shetland, United Kingdom)

    Led the thermal expansion and pipe stress analysis for a 14km subsea pipeline tie-back connecting the Clair Ridge development to the BP-operated hub. Resolved a critical pipeline walking issue caused by cyclic temperature fluctuations by designing a dual-anchor bulkhead system and optimizing insulation coating specifications. Deliverables reduced projected maintenance interventions by 40% over the pipeline's 25-year design life.

  • Duration: 11 months

    Chevron Blind Faith Semisubmersible: Mooring System Upgrade (Garden Banks Block, Texas OCS, Gulf of Mexico)

    Redesigned the mooring chain and connector system on Chevron's Blind Faith semi following inspection findings of accelerated corrosion and wear on four of the twelve mooring legs. Engineered a like-for-like replacement specification using R5 grade studless chain with enhanced corrosion inhibitor coating, developed the installation load-out and tensioning procedure, and provided on-site engineering support during the offshore campaign — restoring full station-keeping integrity and avoiding a potential regulatory-mandated production suspension.

  • Duration: 8 months

    BP Mad Dog Spar: Topside Structural Modification for Phase 2 Tie-In (Green Canyon Block 826, Texas OCS, Gulf of Mexico)

    Led the structural modification engineering for the existing Mad Dog spar to accommodate new production tie-in risers as part of the Mad Dog Phase 2 expansion. Assessed deck load margins, redesigned riser support framing and I-tube assemblies, and produced the full engineering package for offshore execution. The modification enabled a 140,000 BOE/day capacity increase without requiring a new platform installation, delivering significant capital savings to the operator.

12

Years of
Experience

+673

CLIENTS
WORLDWIDE

+2100

Total
Projects

Star

Let's
work together.